Basra The technical and engineering staff in the Iraqi Drilling Company have completed drilling the ZB-506 oil well in the Zubair oil field in Basra, for the benefit of the Zubair Operating Authority.
The Company’s media stated that drilling of the well was completed at a depth of 3596 meters using the IDC 38 drilling rig, with a horsepower of 1500 Hp, with a period of time of 33 days.
Source: National Iraqi News Agency